It might have taken the majority of the day but I’ve finally got the front window screen fitted along with the top of the dash. Before fitting the screen I spent the morning fitting the choke cable along with the heater control cables as this is far easier to do when the screen is not in the car. The previous couple of days has been spent on reassembling the front suspension along with filling and sanding the front mud guards and battery box to try and get them ready to paint. With a bit of luck these will be completed in the next couple of days so I can get them painted.
7-Jun-2009
6-Jun-2009
The engine bay of the car was looking in a very poor state and everything was covered in over spray from when the car was at the paint shop. As I’m unhappy with how it was looking I’ve made the decision to strip the front suspension and engine bay so I can repaint everything. With the bonnet removed and the suspension stripped I also took the opportunity to make and weld a bracket to mount the heater blower motor.
4-Jun-2009
If every thing goes as planned I should be off work till the 12th June so if all goes well I should be able to get the Marcos completed and MOT ready for the Marcos Annual rally. Today was spent working out how to mount the ashtray into the car. once this was completed the remaining carpets were fitted The photo below shows the carpets fitted.
16-May-2009
I’m back at home for a couple of days so its time to continue with the car. I’m starting to have my doubts about weather it will be completed for the 50th anniversary event. As I’m short of time I plan to spend my time on getting the mechanical side completed so I can get an MOT and then if I have any time left I will spend it completing the interior. The weekend has been spent recovering the center section of the dash, and then fitting it to the car. I have also cleaned all the glass in the gauges and polished the gauge chrome surrounds before refitting them. Although its taken most of the weekend I’m happy with how the completed dash looks.